top of page

Instant Sports Tunnel for the Unicef Soccer Aid Gala

Unicef were looking for a company to provide a 6m x 2.4m x 2.4m sports tunnel to use as an entrance to the recent Soccer Aid Gala at The Science Museum, London.


With a turnaround time of less than 45 minutes from entering the other side of the building, to being completely set up – Frameset UK’s unique flat panel system was flexible and light enough to create a tunnel, with time to spare.


Using fifteen 2.4m x 1.2m flat panels, held together with push clamps, the entire tunnel was transported in and set up by just 3 people, from one single flightcase, with time to spare in the 45 minute deadline!

The event was a huge success, and the breakdown of the tunnel, back into one flightcase, took less than 20 minutes!

Save space, time and staff costs with the flexible flat panel system by Frameset UK.

bottom of page